Fully staffed, still missing targets
output, zero additional headcount
- Found
- About 35% of operator time went into non-value activities.
- Done
- Production flow redesigned on Lean principles.
Productivity
Productivity is output divided by input, not effort divided by time. Most gaps come from how work is designed (unclear ownership, stalled handoffs, KPIs that reward activity), not from people trying too little.
Lean removes waste; productivity captures what the waste was hiding: spare capacity, faster throughput, better quality from the same resources.
Output per person, cycle efficiency, utilisation and value-add ratio. The business case is clear before we start.
Gains that rely on pressure or overtime fade. Gains built into the system become the default.
Seven productivity drains
Urgent, low-value work crowds out what matters.
Interruptions and poor handoffs create hidden rework.
Meetings that decide nothing are a tax on capacity.
Disconnected systems and manual re-entry.
People doing work below or outside their ability.
Tasks delayed, duplicated or dropped, silently.
Without daily visibility, small gaps grow into crises.
How a productivity engagement runs
Actual vs. possible output, and where capacity disappears.
Remove friction, fix handoffs, give every task one owner.
Priority rules, new workflow and a KPI board, with the team.
Daily review habits so high output is normal, not a campaign.
Methods
Time, effort and output per role, showing where capacity leaks out of the schedule.
Objectives tied to operational output, not to activity reports.
Return on time per task and role, used to reset priorities.
Lean flow principles applied to office and service work.
A few leading indicators, reviewed every day where the work happens.
Who does what, in what order, to what standard.
Selected cases
output, zero additional headcount
processing time; error rate down 60%
Results from specific engagements; outcomes depend on context.